Wind Power Plant Quoc Vinh Soc Trang

Quoc Vinh Wind Power Plant Project Soc Trang is located in Vinh Hai Ward, Vinh Chau Town, Soc Trang Province, invested by Quoc Vinh Wind Power Company Limited.

Project Information

Client: Quoc Vinh Wind Power Corporation Ltd. Soc Trang
Deployed in: Vinh Chau Town, Soc Trang Province
Service:  Testing and Commisioning for Electrical Equipment

Quoc Vinh Wind Power Plant Project Soc Trang is located in Vinh Hai Ward, Vinh Chau Town, Soc Trang Province, invested by Quoc Vinh Wind Power Company Limited. The project has a total capacity of 129MW with a total investment of 5,320 billion VND. In which, phase 1 has a capacity of 30MW, total investment of 1,420 billion VND; Phase 2 has a capacity of 99MW with a total investment of 3,900 billion VND.

ACEE experimenter conducts a test on the protection relay system of Quoc Vinh Soc Trang Wind Power Plant

When put into operation, Quoc Vinh Soc Trang Wind Power Plant project will bring great, long-term and sustainable benefits, not only contributing to self-assurance of power balance for the Mekong Delta region but also contribute to the economic restructuring of the region, local tourism development… It is expected that phase 1 of the project will be completed in the third quarter of 2021, with an estimated power output of about 108 GWh/ year and phase 2 is estimated at 312 GWh/year.

ACEE experimenter conducts testing of 110kV current transformers at 110kV transformer station of Wind Power Plant Quoc Vinh Soc Trang

Together with the general contractor is FECON Joint Stock Company and the contractors A Chau Industrial Engineering Joint Stock Company, Electrical Consulting Joint Stock Company I, A Chau Electric Energy Joint Stock Company is proud to be trusted to selected to be the supplier of testing and calibration services for the entire 110kV substation and connection lines of this project.

ACEE experimenter conducts testing of 110kV current transformers at 110kV transformer station of Wind Power Plant Quoc Vinh Soc Trang

In the fiery days of June, overcoming difficult obstacles from the Covid-19 pandemic, ACEE’s Board of Directors directed employees to simultaneously launch and complete the testing of the 110kV substation to strive to energize for operation and connect to the national grid to meet the requirements of the Investor.

Project Overview

WATTAGE

30MW

NUMBER OF TURBINES

6

TOTAL INVESTMENT

1400B VND

TURBINE POWER

5MW

SYNCHRONIZING

10/2021

Pictures at the Project

Power the future

Electrical Testing Services For Buildings and Businesses

A Chau Electric Energy Joint Stock Company has been and will strive to become a leading company in electrical testing services in Vietnam, worthy of a prestigious and reliable brand.

We provide services and products to a wide range of customers in a variety of manufacturing and management sectors.