Project Information
Client: Chuprong Gia Lai Wind Power Joint Stock Company and Chuprong Gia Lai Wind Energy Joint Stock Company
Deployed in: ChuProng District, Gia Lai Province
Service: Testing and Commisioning for Electrical Equipments
The Wind Power Plant for Mountain Development and Processing in the Central Highlands is located in Bau Can Commune, Chu Prong District, Gia Lai Province by the Joint Venture of Chu Prong Gia Lai Wind Power Joint Stock Company and Chu Prong Gia Lai Wind Energy Joint Stock Company, known as an investor. The wind power project has a capacity of 100MW, with a total investment of 3,600 billion VND, including 30 wind power poles near roads, near the existing power grid, convenient for connection to the national power system.
This is one of the wind power projects being implemented and urgently completed in Gia Lai province, and is also the opening project for the “wave” to attract foreign investment (FDI) in the province’s potential renewable energy field. It is expected that when put into operation, the project will give a total output of more than 319.5 million KW/year, revenue of more than 627.6 billion VND/year, and contribute more than 125 billion VND/year to the state budget.
With proven prestige and capacity, ACEE is proud to be trusted by the investor to choose as a contractor for testing and calibrating all RMU cabinets and transformers. With a team of highly qualified engineers, a professional working spirit along with efforts, enthusiasm, as well as a spirit of solidarity, ACEE engineers have completed the volume of calibration testing work for all 30 wind power poles ahead of the required time of the investor. Therefore, contributing to ensuring the progress and reliability of the project during the time it is put into operation.
The Mountainous Development and Processing Wind Power Plant in the Central Highlands is evaluated in accordance with the energy development strategy of Vietnam in general and the investment policy of Gia Lai province in particular. When put into operation, the project will contribute to creating more energy sources for economic growth and daily life of Gia Lai people. In addition, the project also attracts tourists to come here to admire and take photos of tea hills and wind power works.
Project Overview
WATTAGE
100MW
NUMBER OF TURBINES
30
TOTAL INVESTMENT
3600B VND
TURBINE POWER
3,3MW
SYNCHRONIZING
Project in 2022
Electrical Testing Services For Buildings and Businesses
A Chau Electric Energy Joint Stock Company has been and will strive to become a leading company in electrical testing services in Vietnam, worthy of a prestigious and reliable brand.
We provide services and products to a wide range of customers in a variety of manufacturing and management sectors.

Electrical Equipment Calibration Experiment

Electrical Equipment Safety Inspection

Verification Of Measuring Instruments, Measurement Standards

Design & Consultancy For Electrical Works