24kV Medium Voltage Switchboard Factory Factory Experiment At ABB Corporation Ltd’s Electrical Panels Factory

A Chau Electric Energy Joint Stock Company (ACEE) cooperated with ABB Automation and Electrification (Vietnam) Corporation Ltd - Bac Ninh Branch to perform partial discharge testing for batches of 24kV medium voltage cabinets before being shipped at the switchboard factory of this area.

Project Information

Client: Asia Industrial Engineering Joint Stock Company (ACIT)
Deployed in: ABB Automation and Electrification (VietNam) Corporation Ltd – Bac Ninh Branch
Service:  Factory Acceptance Test 

In the last days of November, A Chau Electric Energy Joint Stock Company (ACEE) cooperated with ABB Automation and Electrification (Vietnam) Corporation Ltd – Bac Ninh Branch to perform partial discharge testing for batches of 24kV medium voltage cabinets before being shipped at the switchboard factory of this area. This is one of the very important tasks for in-depth evaluation and diagnosis of insulation faults of equipment that cannot be seen by the naked eye before being shipped, requiring strict requirements for accuracy and meticulousness and practical experience in the implementation process.

ACEE testers are connecting the partial discharge measurement diagram for 24kV medium voltage cabinets at the switchboard factory of ABB Automation and Electrification (Vietnam) Corporation Ltd Bac Ninh branch.

The performance of partial discharge diagnostic measurement for many objects such as: generators of thermal power plants, 110kV and 220kV power cables as well as 24kV, 35kV medium voltage cabinets… ACEE’s technical suite is very experienced. Therefore, with this project, ACEE has successfully completed the partial discharge measurement before shipment for the above batch of 24kV medium voltage cabinets and received high appreciation for its capacity, reputation and professionalism.

ACEE testers are connecting the partial discharge measurement diagram for 24kV medium voltage cabinets at the switchboard factory of ABB Automation and Electrification (Vietnam) Corporation Ltd Bac Ninh branch.

Project Overview

WATTAGE

49,2MW

NUMBER OF TURBINES

12

PRACTICE TIME

14 DAYS

TOTAL INVESTMENT

2000B VND

Pictures at the Project

Power the future

Electrical Testing Services For Buildings and Businesses

A Chau Electric Energy Joint Stock Company has been and will strive to become a leading company in electrical testing services in Vietnam, worthy of a prestigious and reliable brand.

We provide services and products to a wide range of customers in a variety of manufacturing and management sectors.