Client: Thuan Binh Wind Power Joint Stock Company
Deployed in: Tuy Phong District, Binh Thuan Province
Service: Periodical Testing for Electrical Equipments
Periodic maintenance is an important step in the operation of the substation. The purpose of periodic maintenance is to detect early failures of equipment after a long period of operation, thereby providing timely remedial and replacement measures, ensuring that the substation is always operated smoothly and safely.
With prestige and capacity in testing, ACEE is trusted by the investor of Phu Lac Wind Power Plant – Binh Thuan to be the unit to perform testing, maintenance and periodical 110kV substation for the factory.
During 4 nights, from October 21 to October 24, 2021, ACEE completed all testing and periodic maintenance work for all electrical equipment and brought Phu Lac – Binh Thuan Wind Power Plant back to normal operation, ensuring safety according to the committed schedule.
Phu Lac Wind Power Plant is a wind power plant located in Lac Tri village, Phu Lac commune, Tuy Phong district, Binh Thuan province. The factory has an area of about 400 hectares, with a capacity of 24 MW, using 12 V100 wind turbines. The plant provides about 200 thousand kWh every day.
Project Overview
WATTAGE
24MW
NUMBER OF TURBINES
12
TOTAL INVESTMENT
1100B VND
TURBINE POWER
2MW
SYNCHRONIZING
11/2016
Electrical Testing Services For Buildings and Businesses
A Chau Electric Energy Joint Stock Company has been and will strive to become a leading company in electrical testing services in Vietnam, worthy of a prestigious and reliable brand.
We provide services and products to a wide range of customers in a variety of manufacturing and management sectors.