Test To Check The Temperature Rise Limit For Low Voltage Switchgear And Control Cabinets

A Chau Electrical Energy Joint Stock Company (ACEE) is proud to be the unit selected by Asia Industrial Engineering Joint Stock Company (ACIT) as a full package supplier of factory testing services for electrical switchboards and low voltage control produced at 2 factories in Quat Dong Industrial Park, Thuong Tin district, Hanoi.

Project information

Client: Asia Industrial Engineering Joint Stock Company (ACIT)
Deployed in: Quat Dong Factory – Quat Dong Industrial Park- Thuong Tin District- Ha Noi
Service:  Factory Acceptance Test

A Chau Electrical Energy Joint Stock Company (ACEE) is proud to be the unit selected by Asia Industrial Engineering Joint Stock Company (ACIT) as a full package supplier of factory testing services for electrical switchboards and low voltage control produced at 2 factories in Quat Dong Industrial Park, Thuong Tin district, Hanoi.

The ACEE experimenter is making the connection of the temperature rise limit test diagram

In many experimental items performed, the test item for testing the temperature rise limit is a typical test item for switchgear and low-voltage control for switchgear and low-voltage control is for the purpose of checking that the temperature of components, equipment, busbars does not exceed the allowable temperature rise limit as prescribed when working with the rated current value.

ACEE laboratory staff is conducting experiments to test the limit of temperature rise

This can be said to be an important test carried out to ensure low-voltage switchgear and control cabinets to detect early heat-related defects during operation for components, equipment, busbars, connections… and to provide a quality switchboard product to customers and partners, improving the stable and long-term operation of the switchboard.

Connection diagram of temperature rise limit tester

Recently, ACEE conducted a test to test the temperature rise limit for a batch of low voltage switchgear and control cabinets at Quat Dong Factory under the witness and acceptance of customers.

Project Overview

WATTAGE

49,2MW

NUMBER OF TURBINES

12

PRACTICE TIME

14 DAYS

TOTAL INVESTMENT

2000B VND

Pictures at the Project

Power the future

Electrical Testing Services For Buildings and Businesses

A Chau Electric Energy Joint Stock Company has been and will strive to become a leading company in electrical testing services in Vietnam, worthy of a prestigious and reliable brand.

We provide services and products to a wide range of customers in a variety of manufacturing and management sectors.