Project Information
Client: Khe Sanh Wind Power Joint Stock Company
Deployed in: Huong Hoa district – Quang Tri province
Service: Calibration test of electrical equipment
If mentioning Quang Tri 50 years ago, it is impossible not to mention priceless historical relics such as Quang Tri Ancient Citadel, Hien Luong Bridge – Ben Hai River, Khe Sanh, Truong Son Cemetery, Vinh Moc Tunnels. This is truly a heroic land with industrious people in labor and bravery in war.
Referring to Quang Tri today is referring to the goal of gradually realizing the dream of becoming a renewable energy center of the Central region and of the whole country. Amaccao Quang Tri 1 wind power plant plays an important part in that common goal. Amaccao Quang Tri 1 wind power plant is invested by Khe Sanh Wind Power Joint Stock Company.
The factory is carried out on a land of 22.1 hectares in Tan Lap, Tan Lien, Huc, Huong Loc communes and Khe Sanh town, Huong Hoa district. With an installed capacity of 49.2MW, 12 wind turbines, and a total investment of 2,000 billion, Amaccao Quang Tri 1 is connected to a 220kV transmission line to connect to the national grid.
To meet the project’s schedule of energizing and generating commercial power, ACEE’s engineers had to isolate and work radially at the construction site. After 2 weeks of efforts, ACEE has completed the calibration test for all the first and second equipment of the 220kV substation that are eligible to energize the national grid. This is a project that imprints the capacity and qualifications of young ACEE engineers with the goal of providing customers with the most reliable, safe and quality testing service.
Wind power is increasingly developing along with solar energy because of its environmental protection and exploitation properties. Amaccao Quang Tri 1 wind power plant was put into construction and exploitation to serve the electricity network for the whole region, reduce the load on the national power grid, contributing to meeting the electricity demand of the people and exploiting the potential of economic efficiency.
Project Overview
WATTAGE
49,2MW
NUMBER OF TURBINES
12
TOTAL INVESTMENT
2000B VND
TURBINE POWER
4,1MW
SYNCHRONIZING
10/2021
Electrical Testing Services For Buildings and Businesses
A Chau Electric Energy Joint Stock Company has been and will strive to become a leading company in electrical testing services in Vietnam, worthy of a prestigious and reliable brand.
We provide services and products to a wide range of customers in a variety of manufacturing and management sectors.